Before
After
"Construction of a plant for the production of electrical equipment using the innovative low-voltage technology RAWAK" located at the following address: Alatau microdistrict, Almaty, Ibragimov Street 9
Download PDF presentationProject passport
| Type of work | Fire protection treatment |
| Date | 2023 |
| Duration | 26 days |
| Material | КЕДР-S BM |
| Total painted area | 3721 м² |
| Region | Almaty |
| Object type | Plant |
| Industry | Mining industry |
Work stages
01
Inspection and measurement
02
Surface preparation
03
Painting works
04
Control and measurements
05
Acceptance and handover