Before
After
Integrated gas treatment plant with a capacity of 1,000,000,000 nm3/year at the Kashagan field in Atyrau region
Download PDF presentationProject passport
| Type of work | Fire protection treatment |
| Date | 2025 |
| Duration | |
| Material | |
| Total painted area | 56922 м² |
| Region | Atyrau |
| Object type | Industrial facility |
| Industry | Oil and gas industry |
Work stages
01
Inspection and measurement
02
Surface preparation
03
Painting works
04
Control and measurements
05
Acceptance and handover