Before After
After
Before

Integrated gas treatment plant with a capacity of 1,000,000,000 nm3/year at the Kashagan field in Atyrau region

Download PDF presentation

Project passport

Type of work Fire protection treatment
Date 2025
Duration
Material
Total painted area 56922 м²
Region Atyrau
Object type Industrial facility
Industry Oil and gas industry

Work stages

01
Inspection and measurement
02
Surface preparation
03
Painting works
04
Control and measurements
05
Acceptance and handover

Project gallery